FPSO Anna Nery (gas compression unit)
Client: Aragon AS
Year: 2020-2021
Many decades of offshore petroleum developments have given the Norwegian oil & gas industry cutting-edge expertise and international recognition. Focus Techouse Engineering is a proud supplier to the business and our senior staff have been part of this adventure for more than thirty years.
We are enthusiastic users of modern methods and systems to identify and solve our clients’ opportunities and challenges. Looking to the future, we are also developing new technical knowledge and experience that will help explore new energy sources and requirements.
Read more about our Engineering Services for Floating Production Storage and Offloading (FPSO) here.
Client: Aragon AS
Year: 2020-2021
Client: Aragon AS
Year: 2020-2021
Client: Wärtsilä Oil & Gas Systems AS
Year: 2019-2020
Client: Kanfa AS
Year: 2019-2020
Client: Kanfa AS
Year: 2019 – 2020
Client: Wärtsilä Oil & Gas Systems AS
Year: 2019
Client: Wärtsilä Oil & Gas Systems AS
Year: 2018 – 2019
Client: Nexans Norway AS
Year: 2018
Client: Kongsberg Maritime AS
Year: 2017 – 2019
Client: Techouse AS
Year: 2017 – 2018
Client: Kanfa Ingenium Process AS
Year: 2017 – 2018
Client: Wärtsilä Oil & Gas Systems AS
Year: 2017 – 2018
Client: Wärtsilä Oil & Gas Systems AS
Year: 2017 – 2018
Client: Kanfa Ingenium Process (part of KANFA GROUP)
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2014
Client: Nexans AS
Year: 2014 – 2015
Client: Kanfa (part of KANFA GROUP)
Year: 2014 – 2015
Client: Dana Petroleum / Sevan Marine
Year: 2011 – 2017
Client: Minox Technology
Year: 2015-2016
Client: National Oilwell Varco (NOV)
Year: 2014
Client: Nexans
Year: 2014
Client: Kongsberg Maritime Engineering AS
Year: 2012
Traditionally, pipe design and pipe stress are performed in two separate models. Ensuring that the two models are aligned is time-consuming. Focus Techouse Engineering has…
Pipe Support structures are typically quite simple. However, what they may lack in complexity they more than make up for in quantity. For the Anna…
Picture borrowed from amazon.com/bergen-industries-inc What can happen if we say: “Those instruments and lamps, we’ll just fix it later…” Only people who have no…
For the Anna Nery FPSO, Focus Techouse Engineering recently designed seven topside modules, with a total of more than 7000 pipe support structures. Thanks to…
At the beginning of the project, there is a battle for the available space on a module. All disciplines will have most of the available…
An engineering project is usually performed in 3 phases. The 3 phases are 30% – 60% and a 90% milestone reviews of the 3D model.…
An engineering project is usually performed in 3 phases. The 3 phases are 30% – 60% and a 90% milestone reviews of the 3D model.…
Focus Techouse Engineering has contributed with engineering work on regas modules for Wärtsilä for several years. Well-functioning digital collaboration platforms and regular project meetings are…
Together with our client, Aragon, we are honored to take part in this project and to participate in the “Anna Nery FPSO Project First Cut…
Aragon has been awarded two contracts by the shipowner Yinson Production to design, procure and construct seven modules for gas treatment and compression for the FPSO «Anna Nery”, which…
For the last three years, Focus Techouse Engineering has carried out a number of projects for Wärtsilä Gas Solutions. Mid-year 2019, the collaboration was formalized…
Focus Techouse Engineering has developed their own software for calculating pipe supports on process modules. The program calculations are carried out very efficiently to the…
Focus Techouse Engineering was responsible for the detail design of all the process modules to be installed on the FPSO platform Dana Western Isles. The…