What can happen if we say: “Those instruments and lamps, we’ll just fix it later…”

Picture borrowed from amazon.com/bergen-industries-inc What can happen if we say: “Those instruments and lamps, we’ll just fix it later…”   Only people who have no EIT (Electro, Instrument, Telecom) knowledge can have this attitude, and it is a serious pitfall for all engineering projects. It can result in a major cost overrun, delay in planning…

Read more

Superfast Pipe Support calculation – does it really exist?

For the Anna Nery FPSO, Focus Techouse Engineering recently designed seven topside modules, with a total of more than 7000 pipe support structures. Thanks to our calculation program, Focus Pipe Support Calculation (FPSC), all of the design and calculations were performed with a team of no more than 12 designers.

Read more

What can go wrong if the Electro Instrument & Telecom discipline is left out from project-start?

At the beginning of the project, there is a battle for the available space on a module. All disciplines will have most of the available space and this space is very limited. In some cases, the module must be expanded to allow all disciplines to place their equipment, and if a discipline is excluded from this work process, we may end up with a module that is not large enough for the job for which it is intended. So, what can go wrong?

Read more

Why it is important for Electro Instrument & Telecom (EIT) engineers to be involved from the very beginning of an engineering project?

An engineering project is usually performed in 3 phases. The 3 phases are 30% – 60% and a 90% milestone reviews of the 3D model. These percentages (30% – 60%-90%) reflect a percentage of completed project, not a percentage of maturity of each discipline. For EIT’s part, we can say that we are usually about 30% finished when a 60% review is held, depending on how extensive the EIT contract is. So, what does this mean?

Read more

The dynamics of Electro Instrument & Telecom (EIT) in an engineering project

An engineering project is usually performed in 3 phases. The 3 phases are 30% – 60% and a 90% milestone reviews of the 3D model. These percentages (30% – 60%-90%) reflect a percentage of completed project, not a percentage of maturity of each discipline. For EIT’s part, we can say that we are usually about 30% finished when a 60% review is held, depending on how extensive the EIT contract is. So, what does this mean?

Read more

The most important thing in a project!

Focus Techouse Engineering has contributed with engineering work on regas modules for Wärtsilä for several years. Well-functioning digital collaboration platforms and regular project meetings are the foundation for successful projects, but the most important ingredient in a good collaboration is the relationship between the participants.

Read more