Our mechanical department can deliver a variety of products; ie safe bike storage

Did you know that yearly about 14,000 bicycles are stolen in Norway? We hope our Clients will take action and put our ideas to the market! Our solutions for safer parking is stunningly flexible and are delivered in sheds with room for 2 bikes –  you can connect as many as you want. You can even build 2 floors, with a lifting system that makes the bike feels like 1 kg when lifting it to the second floor.

Working smarter by integrating stress and piping information in one 3D model!

Traditionally, pipe design and pipe stress are performed in two separate models. Ensuring that the two models are aligned is time-consuming.

Focus Techouse Engineering has made a tool to integrate design information between E3D and Caesar II, saving time, reducing the possibilities for errors, and freeing up the stress engineer to do actual stress design.

Time-saving Pipe Support design – accessible to anyone

Pipe Support structures are typically quite simple. However, what they may lack in complexity they more than make up for in quantity. For the Anna Nery FPSO, Focus Techouse Engineering recently designed seven topside modules, with a total of more than 7000 pipe support structures. Thanks to Focus Pipe Support Calculation program (FPSC), most of this was handled by our Pipe Support design team, freeing up time for our Structural Department.

What can happen if we say: “Those instruments and lamps, we’ll just fix it later…”

Picture borrowed from amazon.com/bergen-industries-inc What can happen if we say: “Those instruments and lamps, we’ll just fix it later…”   Only people who have no EIT (Electro, Instrument, Telecom) knowledge can have this attitude, and it is a serious pitfall for all engineering projects. It can result in a major cost overrun, delay in planning…

Superfast Pipe Support calculation – does it really exist?

For the Anna Nery FPSO, Focus Techouse Engineering recently designed seven topside modules, with a total of more than 7000 pipe support structures. Thanks to our calculation program, Focus Pipe Support Calculation (FPSC), all of the design and calculations were performed with a team of no more than 12 designers.

What can go wrong if the Electro Instrument & Telecom discipline is left out from project-start?

At the beginning of the project, there is a battle for the available space on a module. All disciplines will have most of the available space and this space is very limited. In some cases, the module must be expanded to allow all disciplines to place their equipment, and if a discipline is excluded from this work process, we may end up with a module that is not large enough for the job for which it is intended. So, what can go wrong?